Strategic Building Upgrades Yield Big Savings for Texas School District


In a multi-phase project, Mount Pleasant ISD desired to upgrade outdated equipment and building infrastructure to meet budgetary restrictions and limit disturbances in the K-12 learning environment. Usource helped them plan and execute a path forward that could yield large savings while hitting District goals.
 

Challenge

The project began with a comprehensive feasibility study of existing equipment for nine K-12 schools, encompassing 20 buildings. Some of the HVAC systems were reaching the end of their life-cycle, however, school budgets were limited and no funds were available to replace these aging systems.
 

Solution

Usource designed and implemented a project that replaced aging equipment, improved the classroom environment and reduced the financial risk to Mount Pleasant Independent School District. The School District could save both energy and money while giving students and faculty brighter light levels, improved classroom comfort and increased security. Project design, analysis and construction was completed after hours and during semester breaks to limit disturbances in the classroom and downtime in critical areas.
 

Result

After working with the School District on equipment upgrades, such as new cooling towers, the Usource team was able to lower the District’s energy consumption and lower operations and maintenance costs. Over the life of the contract, the District could be able to save $634,939.

Building upgrades included:
 

  • Building management system upgrade
  • Lighting retrofit
  • Pumping upgrades
  • Roof replacement
  • High efficiency DX air conditioners
  • Football field turf
  • Solar PV
  • Boilers and cooling towers

Money bills icon

$634,939

total savings (over life of contract)*
Clipboard with checklist icon

8

distinct building and system upgrades
School Icon

11

buildings upgraded
Interior shot of school

Read Our Full Case Study

A School District in Texas sought to improve and update existing building systems without disrupting the learning environment. Usource helped them evaluate their options and move forward with a plan that could save the District up to $634,939 over the life of the contract.

Download |

LET’S WORK TOGETHER

Tell us about your energy and decarbonization goals and we’ll source the best options for your organization.

Business people viewing presentation in a conference room

*Savings may vary.

Engineering solutions and Energy Service Company (ESCO) projects conducted throughout the greater U.S. territories (outside of TX) are conducted by NextEra Energy Solutions, LLC. Engineering solutions and Energy Service Company (ESCO) projects conducted within TX territories are conducted through our regional affiliate brand Gexa Energy Solutions, LCC. AL, 000-532-564; AZ, 23529823; CA, 202252310541; CO, 20231046116; CT, 1210177; DE, 5452809; D.C., L00005474903; FL, M23000000462; GA, 22198760; ID, 5241329; IL, 5520088; IN, 201707181205276; KS, 5445564; LA, 43136120Q; ME, 20170006FC; MD, Z1617416; MA, 1231175; MN, 1366676100086; MS, 1392442; MO, FL1435766; NE, 2112319957; NH, 747263; NJ, 400700590; NM, 5512816; NY, 4973749; NC, 2634611; OH, 3920775; OK, 278733969; OR, 211917398; PA, 4308708; RI, 001664811; SC, 230112-1514164; TN, 1194431; TX, 801909660.